866 862 8922Air conditioning and heating equipment takes experience and the proper tools to ensure safe and proper functioning. The final start-up on all cooling systems will require an EPA certification to properly handle the refrigerant.
However, we offer a variety of tools and complete installations instructions for those of you who want to save money and tackle whatever portion of the job you feel comfortable with. Many of our customers will remove the existing equipment and place the new equipment in position. Duct connections can be completed and sealed. Equipment platforms can be pre-made and located as needed. Electrical connections can be made by those qualified.
The final startup will normally require about 2 hours to complete by a certified contractor. Be certain to obtain any necessary inspections required by your local code. Furnaces should be inspected by a qualified contractor prior to final startup.